The area around Clifton is one of the last areas of the layout to be developed.

After months of planning, construction is starting. The track plan will include some street trackage and industrial switching. Some scenery and small buildings have already been installed. The stone wall is made from Hydrocal plaster castings that have been hand painted and assembled into long panels by Bruce.

The scope of the track work and area seemed to get away from the group. So we stepped back and re-evaluated the area. Good thing about this is it got more members involved, and now several other folks have joined in building buildings for the area. We are considering using actual industry names from the actual Clifton area.

Plan:



Factory 1 is still in the box:



Factory 2 & 3 are being built by others.

Factory 4 is a shell so far:



It will allow a track to pass underneath  and another to diverge to the street.


Factory 5 is also a shell:




Just "east" of Clifton is the Yard Lead to Schneider Yard. We're installing a "scale" track at this location:

While not "in" Clifton, the open cut has a tunnel portal that is being incorporated into the plaster work. There will be a girder bridge on the mainline.


And Bruce put some fowl in the lake at Walden: